Former Chemical Processing
Facility Closure
ENTACT performed plant closure activities in preparation
for sale. Site activities included interior and exterior
decontamination of over 100 tanks and associated process
lines; high pressure wet decontamination of trenches,
process rooms, and press building; temporary closure
of Therminol UST systems; and managing of various waste
streams. Gathered product was either returned for reutilization
or disposed at the on-site wastewater/oil water separator.
|
Tank Demolition
ENTACT is currently performing multi-year remediation work at this active refinery.
Site activities have included management of hydrocarbon impacted material;
demolition and disposal of various buildings and concrete support structures;
decontamination, dismantling, and demolition of 40 one million gallon aboveground
storage tanks and additional pipelines; extensive tank and piping asbestos
abatement; and 11 acre wetland creation which included dewatering and treatment
of 30 million gallons of low pH water and placement of 150,000 cubic yards
of fill. |