Ground Improvement
Ground improvement is often needed to increase bearing capacity, reduce settlement, retard seepage, increase stability of slopes, and mitigate liquefaction potential. ENTACT is an industry leader in using various technologies to improve, treat, and reinforce existing ground conditions for environmental and civil applications. We specialize in serving clients with new and expanding plants and facilities, and the development of Liquefied Natural Gas (LNG) facilities. ENTACT is capable of self-performing this work– providing a reliability and accountability that clients count on for cost and schedule control. We have the resources needed to conduct our own soil mix designs and treatability studies, we own the specialized equipment needed to implement the solution, and we employ some of the most experienced personnel in the industry.
Contact ENTACT
Mitch Wall
Business Development Manager – Louisiana
mwall@entact.com
Edwin Rivera
Business Development Manager – Texas
erivera@entact.com
Resources
- In-House Project Management, Field Engineers, Health and Safety Officers, Superintendents, Equipment Operators, Technicians
- Company-Owned Large Fleet of Standard Heavy Equipment
- Company-Owned Specialty Soil Mixing and Stabilization Rigs and Attachments, Grout Batch Plants, Dewatering, Slurry Wall, and Sheet Pile Installation Equipment
- Maintains a Fleet of Low Ground Pressure Equipment
- In-House Bench Scale Treatability Laboratory
- Fully Integrated Project Management, Scheduling, Quality Assurance, and Safety Programs
Services
- Deep Soil Auger Mixing
- Shallow Excavator Mixing – Mass Solidification
- Wet & Dry Soil Mixing
- Soilcrete Columns
- Soil Improvement Services to Support Tank Pad Construction and Tank Farm Expansion
- Ground Improvement for Plant Expansion
- Ground Improvement for LNG Construction
- Overlapping Columns
- In-Situ Gravity Retaining Walls
Featured Project – Freeport LNG Ground Stabilization
- LNG terminal expansion including 3 LNG trains, gas pre-treatment unit and loading dock
- Mass stabilization of over 2.2 M CY of soft dredged sediment and fill soils
- Over 4.2 M CY excavation and backfilling
- Pneumatic conveyance boxes, bucket mixing; 5-8 FT depths; UCS-25 PSI in 28 days
All Services
Environmental Remediation
- Excavation
- Cap & Containment
- Dewatering & Water Treatment
- Decommissioning, Decontamination & Demolition
- Sediment Removal & Wetland Restoration
- Manufactured Gas Plant (MGP) Site Remediation
- Pipeline Abandonment & Removal
- Coal Ash Impoundment & Landfill Closure
- Mine Reclamation & Remediation
- Residential Remediation
- Permeable Reactive Barriers
- Stormwater Management & Erosion and Sediment Controls
All Services
-
Environmental Remediation
-
Geotechnical Construction
-
Soil Mixing & Treatment
-
Coal Ash Impoundment & Landfill Closure
-
Ground Improvement
Environmental Remediation
- Excavation
- Cap & Containment
- Dewatering & Water Treatment
- Decommissioning, Decontamination & Demolition
- Sediment Removal & Wetland Restoration
- Manufactured Gas Plant (MGP) Site Remediation
- Pipeline Abandonment & Removal
- Coal Ash Impoundment & Landfill Closure
- Mine Reclamation & Remediation
- Residential Remediation
- Permeable Reactive Barriers
- Stormwater Management & Erosion and Sediment Controls
Geotechnical Construction
- Ground Stabilization/Settlement & Liquefaction Mitigation
- Earth Retention/Structural Support
- Barrier Walls
- Slurry Wall Construction
Soil Mixing & Treatment
- In-Situ Solidification/Stabilization (ISS)
- Ex-Situ Treatment
- Chemical Fixation
- Chemical Oxidation
- Chemical Reduction
- Bioremediation
- Wet Soil Conditioning
Coal Ash Impoundment & Landfill Closure
- Dewatering and Water Treatment
- Ash Management
- Wet Ash Conditioning
- Landfill Construction
Ground Improvement
- Deep Soil Auger Mixing
- Shallow Excavator Mixing – Mass Solidification
- Wet & Dry Soil Mixing
- Soilcrete Columns
- Soil Improvement Services to Support Tank Pad Construction and Tank Farm Expansion
- Ground Improvement for Plant Expansion
- Ground Improvement for LNG Construction
- Overlapping Columns
- In-Situ Gravity Retaining Walls