FORMER OILFIELD AND SERVICE FACILITY EXCAVATION AND BACKFILL SERVICES
ENTACT conducted remediation activities at a former oilfield and service facility to address soils impacted by volatile organic compounds (VOCs), nonaqueous phase liquids (NAPL), and BTEX (benzene, toluene, ethylbenzene, and xylene). This project effectively remediated the contaminated site, preparing it for potential future use. On this project, ENTACT: Excavated 3,268 cubic yards of impacted soils Performed self-hardening cement-bentonite slurry-supported excavation of 13,000 cubic yards of impacted soils Transported and disposed of 25,500 tons of excavated material off-site Backfilled affected areas

WASTE OIL PITS SUPERFUND SITE
ENTACT performed in-situ stabilization (ISS) of 45,000 cubic yards of hydrocarbon sludge at a former waste oil pits site located within a cypress swamp. The project faced significant challenges, including the relocation of a half-mile section of an existing stream away from the former waste pits. These efforts contributed to the effective remediation of the site while minimizing environmental impact and preserving the surrounding ecosystem. Upon project completion, ENTACT had: Performed ISS of 45,000 cubic yards of hydrocarbon sludge Excavated